Boojum Under Construction
Update: 14 September 1999

Hull welded up completed.

Click here for more constuction photos

Above: view from the pilot house, showing foredeck structure going in.
Right: anchor locker and shower sump.
Below: engine beds and bulk fuel tank with inspection plates in place.
Return to the Boojum site