Boojum 11 October 2000


Pictures from my latest yard visit. The interior is mostly lined, except for the head, which is in process. The fridge is nearly complete, but the pilot chair needs a lot of work. The pilothouse is looking good, with the galley coming along nicely.



dscn8957-1.html dscn9076.html
Boojum in the shop TC on the stern
dscn8950.html dscn8951.html
Aft cabin Aft cabin locker door
dscn8952.html dscn8953.html
Saloon and head Galley frame
dscn8955.html dscn8956.html
Fridge box outisde Fridge interior

Another update tomorrow, after further talks with joiners and electrician.

Boojum
More construction photos